ENCLOSURE INTEGRITY TEST — HOLD TIME
| Certificate No | Client | ||
| Job number | Site | ||
| Date of test | Building | ||
| Engineer | Enclosure |
Job
Engineer
Enclosure
Extinguishing system
Mixing during the hold time
Will anything keep the air moving after discharge — AHU or CRAC units left running, strong heat sources, fans? This decides which equation applies (E.2.5.2).
Sketch plan and photos
Show the room and its surroundings, doors, ducts, dampers and drains, and whether each is open or closed during the hold time (E.2.5.1). A photo of a hand sketch is fine. Up to 6 photos.
Equipment
Conditions
Pre-test checklist
Pressurisation
Five readings, spaced from the highest stable pressure (prefer ≤ 60 Pa) down to 10 Pa or 10|Pbt|, whichever is higher. Enter the room pressure as read (with bias); the app removes Pbt.
Depressurisation
Leakage characteristic
Bias after the fan test
Field calibration check
E.2.7.5: fit a plate with a known hole, about half the room's ELA, and repeat the readings. The fan's measurement of the hole must be within ±15 % of its real area.
Summary
Warnings
None.
Hold time against protected height
Assumptions recorded
Calculated values (Annex E)
Engineer's report
On completion
Sign-off
For and on behalf of LHS Fire Limited. Fan and gauge calibration as recorded above. Calculation to BS EN 15004-1:2019 Annex E with F = 0.5.